A look at what our crews are building and finishing across Silver Lakes.
Real before-and-after shots from jobs our crews have just wrapped up.
Before
AfterWaterlogged bed trenched, geo-fabric lined, piped and gravel-packed.
Before
AfterCorroded stub replaced with new PVC and a proper elbow joint.
Before
AfterFull teardown, parts cleaned and reassembled - running like new.
Before
AfterCarb cleaned, blade sharpened and tuned before collection.
Before
AfterBrick-built braai and bench seating, plastered and cured.
Boundary wall fitted with a monitored electric fence line.
Movement crack diagnosed, raked out and structurally repaired.